Works Completed on site (up to 14/02): In total, there are 37 concrete units to be cast on site to form the new bridge. These include 8 large units (box culvert units); 12 wingwall units; and 17 smaller units including headwall and towpath units. The large units weigh up to 64t. 7 units have been […]