Ocean Rail Bridge – 22/02/21

Update The results of the recent geological investigations were assessed and a decision was taken to defer the installation of the bridge to December 2021. The investigations have shown that the bedrock of the canal beneath the railway bridge is at a deeper level than reported by previous surveys. This means that construction plans have […]

Read More… from Ocean Rail Bridge – 22/02/21